File #: 19-0319    Version: 1 Name: Resolution in Support Frelinghuysen Avenue (Rt. 27) with Empire Street Intersection Improvements
Type: Resolution Status: Adopted
File created: 2/20/2019 In control: Engineering
On agenda: 5/1/2019 Final action: 5/1/2019
Title: Dept/ Agency: Engineering Action: ( ) Ratifying (X) Authorizing ( ) Amending Type of Service: Resolution of Support Purpose: To provide safety and traffic signal improvements to minimize traffic accidents. Location: Frelinghuysen Avenue (Route 27) and Empire Street, Newark, New Jersey Additional Information:
Sponsors: Council of the Whole
Title
Dept/ Agency: Engineering
Action: ( ) Ratifying (X) Authorizing ( ) Amending
Type of Service: Resolution of Support
Purpose: To provide safety and traffic signal improvements to minimize traffic accidents.
Location: Frelinghuysen Avenue (Route 27) and Empire Street, Newark, New Jersey
Additional Information:

body

WHEREAS, the New Jersey Department of Transportation (NJDOT) has proposed to improve safety to minimize the accidents at the intersection of Frelinghuysen Avenue (Route 27) with Empire Street in the City of Newark. This intersection of improvements is included in a NJDOT project to improve another intersection along Route 27 with Magnolia Street in the City of Elizabeth; and

WHEREAS, the major items of proposed improvements are summarized as follows:

* Redesigning the entire intersection to correspond with the current traffic and pedestrian volume;

* Upgrading the traffic signal equipment and optimization of traffic signal timing and phasing;

* Installation of new and upgraded signage, striping and paving;

* Improvements to the traffic and pedestrian flow, safety and efficiency;

* Providing the most efficient lane configuration to reduce and minimize traffic congestions, accidents and creation of the safest path for pedestrian crossing; and

WHEREAS, the Department of Engineering will be an active participant in reviewing the design and specifications to ensure that intersection proposed improvements correspond with the City's requirements and needs; and

WHEREAS, a comprehensive construction detour, for vehicles, buses and trucks, will be implemented to minimize the traffic back up and congestion during the months of construction of the project which is approximately scheduled to start on or about May 2020; and

WHEREAS, combination measures that improve the flow of traffic including temporary restriping, signing, signal timing modifi...