File #: 14-0174    Version: 1 Name: Motion - Traffic study @ Fleetwood Place/Ellery St
Type: Motion Status: Filed
File created: 2/7/2014 In control: Municipal Council and City Clerk
On agenda: 1/22/2014 Final action: 1/22/2014
Title: A motion requesting that the Department of Engineering, Division of Traffic and Signals, perform a traffic study at the intersection of Fleetwood Place and Ellery Avenue to determine the feasibility of a stop sign installation.
Title
A motion requesting that the Department of Engineering, Division of Traffic and Signals, perform a traffic study at the intersection of Fleetwood Place and Ellery Avenue to determine the feasibility of a stop sign installation.